The Head Quarters and Servo Factory (opens and closes by click)
It has the administration section, the design section, the marine division, and the factory which is manufacturing and checking such as the servo-related products and small controllers.
In the design section, hardware development is carried out with about 50 units of CAD including the three-dimensional CAD, drawing CAD and PCB-CAD, and approximately 20 software designers develop them as charge of each product.
In the design section, hardware development is carried out with about 50 units of CAD including the three-dimensional CAD, drawing CAD and PCB-CAD, and approximately 20 software designers develop them as charge of each product.
The Administration Building
As a point of contact for our customers, we recieve the product orders and perform the production instructions and parts purchase to the factories in a lump.
Showroom
There is a showroom to display our products on the 2nd floor of the administration building.
Technical Building
By using the latest 3DCAD, hardware and software design is being performed to develop the in-house products, the system products along customers' requests, and the small product units.
Technical Building Facilities
Category | Facilities and equipment |
---|---|
Fast / Burst Analyser | FNX-AX3 B50 |
Spectrum Snalyzer | N9320A |
Noise Simulator | INS-420 |
Static Simulator | ESS-2000AX |
Digital Torquemeter | TS200,TS-3200A |
Torque Converter | TS-2700 |
Torque Detector | SS-005, SS-020, SS-050, SS-100, SS-500 |
Digital Oscilloscope | TDS5054 |
Digital Rev Counter | HT-5100 |
Power HiTester | 3194 |
Cramp Meter | 8283 |
Servo Manufacture Group
Servo Manufacture Group is manufacturing and checking unit products to the main force such as the in-house products Si servo, Cuty AxisIII, and Cuty Aligner which are developed in the design section.
Moreover, we are manufacturing mechanic products such as Spray Coater, Para Robo and the Squid Fishing Machine and so on, and manufacturing small and medium type control panels according to the customers' needs.
Moreover, we are manufacturing mechanic products such as Spray Coater, Para Robo and the Squid Fishing Machine and so on, and manufacturing small and medium type control panels according to the customers' needs.
Qualifications and the number of Qualified people (Servo factory)
The electric-equipment assembly technician | Electric-equipment assembly [The 2nd grade]:1 Electric-equipment assembly (Sequence control) [The 2nd grade]:4 |
---|---|
Electronic circuit connection technician | Electronic circuit connection [The 1st grade]:5 |
Servo factory facilities
For Manufacturing
Category | Facilities and equipment [numbers] |
---|---|
Hot Marker | CTK [2] |
Cable Stripper | Zoken [1] MK Electronics [1] newly introduced in 2012 Schleuniger [1] newly introduced in 2012 |
Automatic and Half Automatic Crimping Machine | Honda [1] Union Machinary [1] Half Automatic Crimping Machine [2] ※The applicator [JST,AMP,HRS,DDK,Sumiko Tec] |
For Inspection
Category | Facilities and equipment [number] |
---|---|
Cable Checker | [1] |
Board inspection systems | Marantz [1] newly introduced in 2011 |
In-circuit tester | TAKAYA [1] |
Kiyoji factory (opens and closes by click)
There are first and second factories on the site of about 3,300 square meters. Mainly we perform sheet metal processing and control panel manufacturing in these factories.
In addition, because these factories are surrounded by beautiful scenery and clear stream, we equip environment-friendly powder coating facilities and no drainage system.
In addition, because these factories are surrounded by beautiful scenery and clear stream, we equip environment-friendly powder coating facilities and no drainage system.
Sheet metal group
Based on the design data released by the design section, sheet metal products are produced consistently in the process of processing, welding and painting on the 1st floor.
It is delivered to the manufacture group which is the next process after the sheet metal completion.
We produce and sell sheet metal itself as well.
It is delivered to the manufacture group which is the next process after the sheet metal completion.
We produce and sell sheet metal itself as well.
Qualifications and the number of Qualified people (Sheet metal group)
Factory sheet metal technician | Factory sheet metal [High grade]: 1 Machinery sheet metal work [1st grade]: 3 [2nd grade]: 6 Numerical control turret punch press sheet metal work [1st grade]: 3 |
---|---|
The coating technician | Metal coating work [1st grade]: 2, [2nd grade]: 1 |
Sheet metal group facilities
For Sheet Metal
Operation | Facilities and equipment |
---|---|
Deployment processes and blank CAM creation |
ASIS100PCL AP100 Sheet Works Dr. ABE Blank |
Bending CAM Creation | Dr. ABE Bend |
Blank precessing (Punching, laser) |
MARS EMZ-3510NT LC-1212αⅣ |
Bender operation | HDS-1303NT FBDIII-8025NT RG-125 |
Stud-welding | GUNMAN1000II |
For Coating
Line / Facility | Facilities and numbers |
---|---|
Automatic preliminary-treatment line | |
Automatic coating line | Composition coating [Plating and air drying] Powder coating [Powder coating gun (Landsburg ):2] |
Drainless processor |
Kiyoji manufacturing group
The sheet metal which was manufactured by sheet metal group is delivered to manufacturing group which is the next process and it is concluded in a product based on the drawing by the design section.
We are meeting the customers' wide needs from the small control panels, NC heavy current electric boards, to the large-sized system boards in addition to the in-house products.
We are meeting the customers' wide needs from the small control panels, NC heavy current electric boards, to the large-sized system boards in addition to the in-house products.
Kiyoji manufacturing group facilities
For manufacturing
Category | Facilities and equipment [numbers] |
---|---|
Cable stripper | KODERA Electronics [1] |
Automatic and Half Automatic Crimping Machine | JAM [2] ※Applicator (JAE, AMP, HRS, HONDA) |
Hot marker | CTK [3] |
For inspection
Category | Facilities [numbers] |
---|---|
Cable checker | NAC CORPORATION [2] |
Plottage
Plottage | 7998.6 ㎡ | |
---|---|---|
Total floor area | 1st factory | 2925.4 ㎡ |
2nd factory | 2886.4 ㎡ | |
Staff parking | 3192.5 ㎡ |
Marine factory (opens and closes by click)
This is the factory of elite corps that "the experienced craftsmen" undertake manufacturing, checkouts, packaging, shipping, repairing and maintenance of Squid fishing machines and tuna longline machines and so on.
We visit customers and do the commissioning work as well.
We visit customers and do the commissioning work as well.
Plottage
Plottage | 3060.0 ㎡ | |
---|---|---|
Total floor area | 1st factory | 346.4 ㎡ |
2nd factory | 277.6 ㎡ | |
Staff parking | 1500.0㎡ |